Experimental Study on Progressive Collapse Resistance of Fully Assembled Precast Concrete Frames under Static Loading

Authors

  • Yujie Huang Shenzhen Institute of Building Research Co., Ltd., Shenzhen 518000, Guangdong, China

DOI:

https://doi.org/10.6919/ICJE.202611_12(11).0008

Keywords:

Fully Assembled Precast Concrete Frame; Progressive Collapse; Beam-column Dry Connection; Quasi-static Pushdown Test.

Abstract

To examine how a fully assembled precast concrete frame resists progressive collapse, three half-scale subassemblies were prepared for a middle-column removal test: one monolithic reinforced concrete specimen (RC) as the baseline, and two precast joint specimens distinguished by corbel detail-PC1 with an exposed corbel and PC2 with a hidden corbel. Their load-resisting mechanisms and failure modes were compared under the same quasi-static pushdown protocol. The monolithic RC specimen developed both compressive arch action (CAA) and catenary action (CA); its second, catenary-stage peak reached roughly 22% above the CAA peak. PC2 likewise showed a two-stage response, yet its catenary mechanism remained underdeveloped, with the catenary peak at only 79% of the arching peak. PC1 stopped after the arching stage, failing through shear fracture of its dowel bars. Relative to RC, the CAA peaks of PC1 and PC2 stood at 76% and 81%, while their side-column restraint stiffness was comparable to the monolithic baseline. The test observations are expected to inform the collapse-resistant design of fully assembled precast frames.

Downloads

Download data is not yet available.

References

[1] Liu, Y. L., Li, Y., Zhao, Z. D., Diao, M. Z., & Sun, H. L. (2022). Experimental study on progressive collapse resistance of monolithic precast concrete frame structures. Journal of Building Structures, 43(Suppl.1), 123–132.

[2] Gu, X. L., Zhang, B., Huang, X. K., Yu, Q. Q., & Deng, T. H. (2022). Experimental investigation on progressive collapse resistance of precast concrete frame structures with different beam-column connections. Journal of Building Engineering, 51, Article 104280. https://doi.org/10.1016/j.jobe.2022.104280

[3] Shi, Y. C., Li, L. M., Guo, H. S., Li, Z. X., Shi, P. F., Zhao, B., Zhou, J., Liu, H. K., & Guo, Z. P. (2023). Experimental study on top corner column removal of a five-story full-scale precast prestressed efficiently fabricated frame. Journal of Building Structures, 44(5), 1–12. https://doi.org/10.14006/j.jzjgxb.2021.0808

[4] Zhao, Z. D., Cheng, X. W., Li, Y., Guan, H., Zhang, W., & Liu, Y. (2023). Progressive collapse analysis of precast reinforced concrete beam-column assemblies with different dry connections. Engineering Structures, 287, Article 116186. https://doi.org/10.1016/j.engstruct.2023.116186

[5] Liu, Y., Zhao, Z. D., Cheng, X. W., Li, Y., Diao, M. Z., & Sun, H. L. (2022). Experimental and numerical investigation of the progressive collapse of precast reinforced concrete frame substructures with wet connections. Engineering Structures, 259, Article 114157. https://doi.org/10.1016/j.engstruct.2022.114157

[6] Yang, T., Xie, Y. K., & Hao, T. Z. (2023). Experimental study on dynamic collapse behavior of precast concrete frame substructures. Journal of Disaster Prevention and Mitigation Engineering, 43(2), 245–254.

[7] Qian, K., Liang, S. L., Fu, F., & Li, Y. (2022). Progressive collapse resistance of emulative precast concrete frames with various reinforcing details. Journal of Structural Engineering, 148(6), Article 04022064. https://doi.org/10.1061/(ASCE)ST.1943-541X.0003246

[8] Li, Z. X., Liu, H. K., Shi, Y. C., Ding, Y., & Zhao, B. (2021). Experimental investigation on progressive collapse performance of prestressed precast concrete frames with dry joints. Engineering Structures, 247, Article 113147. https://doi.org/10.1016/j.engstruct.2021.113147

Downloads

Published

2026-11-15