BIM-Based Integrated Management System for Intelligent Timber Structure Construction Factories: Production Optimization and Carbon Emission Monitoring

Authors

  • Long Zhang Hebei University of Engineering Science, Shijiazhuang 050091, China;School of Civil Engineering, Shi Jiazhuang Tiedao University, Shijiazhuang 050043, China
  • Guowen Zhang School of Civil Engineering, Shi Jiazhuang Tiedao University, Shijiazhuang 050043, China
  • Wentao Qiao School of Civil Engineering, Shi Jiazhuang Tiedao University, Shijiazhuang 050043, China;Key Laboratory of Roads and Railway Engineering Safety Control (Shijiazhuang Tiedao University), Ministry of Education, Shijiazhuang, Hebei 050043, China
  • Yiqiang Li Hebei University of Engineering Science, Shijiazhuang 050091, China
  • Qingqing Xiong School of Civil Engineering, Shi Jiazhuang Tiedao University, Shijiazhuang 050043, China

DOI:

https://doi.org/10.6919/ICJE.202609_12(9).0019

Keywords:

Intelligent Timber Construction; Building Information Modeling; Carbon Footprint Tracking; Factory Management System.

Abstract

Driven by the carbon peaking and carbon neutrality goals, the construction industry is facing an increasingly urgent demand for low-carbon transformation. As a major form of green building, timber structures require improved digital collaboration in production and more refined carbon emission management. To address this issue, this study proposes a novel integrated management system for the intelligent management of smart timber construction factories. The system develops a BIM-driven production and fabrication mode, constructs an integrated management architecture combining refined production management and carbon emission monitoring, and establishes a corresponding management platform. The platform enables full-process digital closed-loop management from raw material procurement to finished-product shipment, as well as full-chain carbon emission quantification. A practical application in a prefabrication factory demonstrates the feasibility, effectiveness, and engineering applicability of the proposed method and system.

Downloads

Download data is not yet available.

References

[1] IPCC. (2022). Climate change 2022: Impacts, adaptation and vulnerability. Cambridge University Press.

[2] Ramage, H. M., Burridge, H., Busse-Wicher, M., et al. (2017). The wood from the trees: The use of timber in construction. Renewable and Sustainable Energy Reviews, 68, 333–359.

[3] Gong, X., Nie, Z., Wang, Z., et al. (2012). Life cycle energy consumption and carbon dioxide emission of residential building designs in Beijing. Journal of Industrial Ecology, 16(4), 576–587.

[4] Tollefson, J. (2017). The wooden skyscrapers that could help to cool the planet. Nature, 545(7654), 280–282.

[5] Macinnis-Ng, C., Wyse, V. S., Webb, T., et al. (2017). Sustained carbon uptake in a mixed age southern conifer forest. Trees, 31(3), 967–980.

[6] He, M., Li, Z., Lam, F., et al. (2014). Experimental investigation on lateral performance of timber-steel hybrid shear wall systems. Journal of Structural Engineering, 140(6), 04014029.

[7] Hao, D., Xiamin, H., Zhong, X., et al. (2021). Experimental and analytical investigation on fire resistance of glulam-concrete composite beams. Journal of Building Engineering, 44.

[8] Hao, D., Xiamin, H., Guohui, H., et al. (2021). Experimental and analytical investigation on flexural behaviour of glulam-concrete composite beams with interlayer. Journal of Building Engineering, 38.

[9] Lamothe, S., Sorelli, L., Blanchet, P., et al. (2020). Engineering ductile notch connections for composite floors made of laminated timber and high or ultra-high performance fiber reinforced concrete. Engineering Structures, 211, 110415.

[10] Opgenorth, N., Locatelli, N. D., Leder, S., et al. (2024). Multi-scalar robotic fabrication system for on-site press gluing in multi-storey timber buildings. Automation in Construction, 168, 105774.

[11] Jakob, H. W., Martin, A., Ondrej, K., et al. (2020). Flexible and transportable robotic timber construction platform – TIM. Automation in Construction, 120, 103400.

[12] Regina, P. A. L., Elisabeth, B., Tim, S., et al. (2023). Automated on-site assembly of timber buildings on the example of a biomimetic shell. Automation in Construction, 156.

[13] Mikael, E., Dahniel, J., & David, S. (2021). AI-Based quality control of wood surfaces with autonomous material handling. Applied Sciences, 11(21), 9965.

[14] Babič, Č. N., Podbreznik, P., & Rebolj, D. (2009). Integrating resource production and construction using BIM. Automation in Construction, 19(5), 539–543.

[15] Abanda, F., Tah, J., & Cheung, F. (2017). BIM in off-site manufacturing for buildings. Journal of Building Engineering, 14, 89–102.

[16] Yin, X., Liu, H., Chen, Y., et al. (2019). Building information modelling for off-site construction: Review and future directions. Automation in Construction, 101, 72–91.

[17] Li, X., Shen, Q. G., Wu, P., et al. (2019). Integrating Building Information Modeling and Prefabrication Housing Production. Automation in Construction, 100, 46–60.

[18] Martinez, E. V., Pablo, M., & Rafiq, A. (2024). Target-path planning and manufacturability check for robotic CLT machining operations from BIM information. Automation in Construction, 158.

[19] Jang, S., & Lee, G. (2018). Process, productivity, and economic analyses of BIM–based multi-trade prefabrication-A case study. Automation in Construction, 89, 86–98.

[20] Wang, S., Wan, J., Zhang, D., et al. (2016). Towards smart factory for industry 4.0: a self-organized multi-agent system with big data based feedback and coordination. Computer Networks, 101, 158–168.

[21] Coronado, U. D. P., Lynn, R., Louhichi, W., et al. (2018). Part data integration in the Shop Floor Digital Twin: Mobile and cloud technologies to enable a manufacturing execution system. Journal of Manufacturing Systems, 48, 25–33.

[22] Zhang, H., Qing, Q., & Tao, F. (2022). A multi-scale modeling method for digital twin shop-floor. Journal of Manufacturing Systems, 62, 417–428.

[23] Zhang, M., Tao, F., & Nee, A. (2020). Digital twin enhanced dynamic job-shop scheduling. Journal of Manufacturing Systems.

[24] Fan, Y., Yang, J., Chen, J., et al. (2021). A digital-twin visualized architecture for Flexible Manufacturing System. Journal of Manufacturing Systems, 60, 176–201.

[25] Guo, D., Zhong, Y. R., Lin, P., et al. (2020). Digital twin-enabled Graduation Intelligent Manufacturing System for fixed-position assembly islands. Robotics and Computer-Integrated Manufacturing, 63, 101917.

[26] Guo, W., Li, Y., Tang, D., et al. (2022). Using real-time manufacturing data to schedule a smart factory via reinforcement learning. Computers & Industrial Engineering, 171.

[27] Ding, Z., Liu, S., Luo, L., et al. (2020). A building information modeling-based carbon emission measurement system for prefabricated residential buildings during the materialization phase. Journal of Cleaner Production, 264.

[28] Tao, X., Mao, C., Xie, F., et al. (2018). Greenhouse gas emission monitoring system for manufacturing prefabricated components. Automation in Construction, 93, 361–374.

[29] Liu, G., Chen, R., Xu, P., et al. (2020). Real-time carbon emission monitoring in prefabricated construction. Automation in Construction, 110, 102945.

[30] Xu, J., Teng, Y., Pan, W., et al. (2022). BIM-integrated LCA to automate embodied carbon assessment of prefabricated buildings. Journal of Cleaner Production, 374.

[31] Xu, J., Zhang, Q., Teng, Y., et al. (2023). Integrating IoT and BIM for tracking and visualising embodied carbon of prefabricated buildings. Building and Environment, 242, 110492.

[32] Wang, X., Truijens, M., Hou, L., et al. (2014). Integrating Augmented Reality with Building Information Modeling: Onsite construction process controlling for liquefied natural gas industry. Automation in Construction, 40, 96–105.

[33] GB/T 51366-2019. (2019). Standard for building carbon emission calculation. China Architecture & Building Press.

Downloads

Published

2026-10-15

Issue

Section

Articles

How to Cite

Zhang, L., Zhang, G., Qiao, W., Li, Y., & Xiong, Q. (2026). BIM-Based Integrated Management System for Intelligent Timber Structure Construction Factories: Production Optimization and Carbon Emission Monitoring. International Core Journal of Engineering, 12(9), 171-182. https://doi.org/10.6919/ICJE.202609_12(9).0019