Addressing issues such as insufficient production capacity, low efficiency, and prolonged cycle times for Company A's S1 product, this study employs Value Stream Mapping (VSM) to conduct an in-depth analysis of its actual production status.to identify inefficiencies such as waste and waiting. Optimization was achieved through methods including ECRS (Engineering Change, Reengineering, Simplification, and Reduction) principles for quick die change and lean manufacturing practices. These measures eliminated or reduced non-value-added activities, improved line balancing rates, and refined process parameters via DOE (Design of Experiments) experiments. Consequently, S1 production efficiency and capacity increased, cycle times decreased, customer responsiveness accelerated, and overall company competitiveness enhanced.

Downloads

Download data is not yet available.

References

[1] WANG Qin, MA Lin, LI Yang. Research on production process optimization based on value stream mapping. China New Technology and New Products, 2025, (20): 122-126.

[2] AN Ziyun, XU Zhihong. Improvement study of cabinet door panel production line based on value stream mapping. China Storage and Transportation, 2025, (09): 224.

[3] LI Jiuhu. Research on intelligent manufacturing improvement of packaging processes based on value stream mapping at Company C. Yangzhou: Yangzhou University, 2025.

[4] LI Qinglin, SUN Chunmei. Research on improvement methods for M production line based on value stream mapping. Value Engineering, 2025, 44(15): 134-136.

[5] YAN Shuo. Research on lean improvement of Company A‘s tank assembly line based on value stream mapping. Shijiazhuang: Hebei University of Science and Technology, 2024.

[6] WANG Cheng. Research on production system optimization for product B at Company H based on lean manufacturing. Qingdao: Qingdao University of Technology, 2025.

[7] LIU Gang. Research on production management improvement based on lean production in Company G. Dalian: Dalian University of Technology, 2024.

[8] WANG Dengxue, ZHANG Hao, WANG Xi, et al. Application and research of design of experiments (DOE) in process design for thickness of air conditioner anti-corrosion coating. Electromechanical Engineering Technology, 2025, 54(17): 172-179.

[9] LUO Guojun, WANG Nengsong, LIU Yulin, et al. Analysis of SMT defects in EBC connectors based on DOE methodology. Electromechanical Engineering Technology, 2025, 54(09): 168-172.

Downloads