Zhang, Long, et al. “BIM-Based Integrated Management System for Intelligent Timber Structure Construction Factories: Production Optimization and Carbon Emission Monitoring”. International Core Journal of Engineering, vol. 12, no. 9, Oct. 2026, pp. 171-82, https://doi.org/10.6919/ICJE.202609_12(9).0019.